01
ASME 'U' and 'R' stamps
Code-stamped construction and repair authorization. Documentation packages compliant with ASME Section VIII Division 1, plus jurisdictional requirements (CRN in Canada, PED in Europe).
Step 03 of 05
Once the pilot is validated, the production system is built. Petro Sep operates an ASME-certified fabrication shop in Mississauga, with the welding qualifications, materials inventory, and quality systems to deliver code-stamped pressure equipment for jurisdictions worldwide. We do not subcontract the build. Your system is fabricated by the same team that engineered it.
What you get at this step
At the end of asme-certified fabrication, here is what changes for your project.
Capabilities and equipment
We do not subcontract this step. The capabilities and equipment below are in-house, and they show up on your project.
01
Code-stamped construction and repair authorization. Documentation packages compliant with ASME Section VIII Division 1, plus jurisdictional requirements (CRN in Canada, PED in Europe).
02
Stainless steels (304L, 316L, duplex, super-duplex), carbon steel, nickel alloys (Hastelloy, Inconel). All welds traceable, all welders certified per ASME Section IX.
03
Systems delivered as factory-tested skids, ready for plumb-and-play installation. Reduces field work, accelerates startup.
04
Stainless and exotic alloy plate, fittings, and instrumentation in stock. Reduces lead time on standard configurations.
Send us a sample, a sentence about your goal, and a target timeline. We will tell you whether membrane separation fits and what we would do at each of the five steps.