01
Remote monitoring (24/7)
SCADA telemetry to our operations center. Our engineers see drift, fouling, and trip events the same time your operators do, often sooner.
Step 05 of 05
A membrane system that runs perfectly for a year and then fouls in week 53 is not a working system. Petro Sep stays involved beyond commissioning: continuous remote monitoring, scheduled maintenance, membrane replacement, and on-call response. Some customers run their systems entirely with our team; others use us as backup to in-house operations. Both work, and we engineer for either.
What you get at this step
At the end of operations management, here is what changes for your project.
Capabilities and equipment
We do not subcontract this step. The capabilities and equipment below are in-house, and they show up on your project.
01
SCADA telemetry to our operations center. Our engineers see drift, fouling, and trip events the same time your operators do, often sooner.
02
Cleaning regimes tuned to your specific fouling profile. Membrane replacement scheduled by performance, not calendar.
03
Phone or video support within 2 hours, on-site response within 48 hours for critical issues. Service level agreement scoped per contract.
04
Monthly performance reports, quarterly review meetings, annual optimization audits. Continuous improvement is part of the contract, not an extra.
Send us a sample, a sentence about your goal, and a target timeline. We will tell you whether membrane separation fits and what we would do at each of the five steps.